|
|
|
Capital Improvements
> Projects in Design
|
<< Return
|
Projects in Design
|
|
Name | | | Long-Term Infrastructure Developement Plan | On April 17, 2013, the Airport announced its decision to move forward with a Long-Term Strategic Development Plan to construct a new terminal facility. Five alternatives were considered. Four of the alternatives - No Action Alternative, Refurbishment Alternative Southside Alternative, and Westside Alternative - involve rehabilitation or new construction on the southeast side of the Airport on or near the current terminal location. The preferred alternative is the Northside Alternative located on the northeast side of the Airport property. | | Airfield Electrical Rehabilitation | The project will rehabilitate and improve the reliability of the airfield electrical system. The work consists of the demolition of existing electrical ductbanks; installation of new electrical ductbanks with associated circuit cable; replacement of runway /taxiway edge and centerline lights; replacement of runway touchdown zone lights; replacement and/or upgrades of airfield signage; replacement and/or reconfiguration of windcones; electrical vault improvements; and new constant current regulators, and reconfiguration/improvements to the airfield lighting control and monitoring system. |
|
|
|
|