Projects Completed
|
Number of Projects Completed: 13
Estimated Aggregate Project Value: $30,570,951
-
East Roof Replacement: Concourses A and B
-
Terminal/Concourse C and D Roof
-
Main and West Terminal Roof Replacement
-
Terminal and Concourse Repairs - Interior (Hurricane Repair)
-
Transportation and Parking Facilities (Hurricane Repair)
-
Ancillary Facilities - Roofs and Exteriors (Hurricane Repair)
-
Ancillary Facilities - Interiors (Hurricane Repairs)
-
Bulding 258 - Airline Cargo Building (Hurricane Repairs)
-
Bulding 300 - Perishable Goods Center (Hurricane Repairs)
-
Exterior Terminal Improvements - Phase 1 (Loop Road) Terminal and Concourse Repairs - Parabola Roof (Hurricane Repair)
|
Name | | | Airport GIS |
 The FAA established a pilot program to translate the existing Airport Layout Plan into "live" GIS data as a way to both track and maintain obstructions on and around the airport.
| | Expansion of Concourse D |
 This project provided an additional six (air carrier) gates to
the current seven gates on Concourse D. Also included are new food and beverage
concessions, retailers, restrooms and modifications to the security checkpoint
that will allow for the increased capacity.
| | Interior Terminal Improvements: Phase 2 (FIDS, GIDS, BIDS Replacement) |
 This project provided for the complete replacement of the existing Multi-User Flight Information Display System (MUFIDS) with wide-format panel LCD screens in all concourse and terminal locations.
| | New Airfield Lighting Vault |  This
project provides a new airfield lighting vault on the north side of the
airfield to the east of the existing General Aviation apron area.
| | North Perimeter Road Improvements |
 This project provided for the rehabilitation and realignment of
the existing North Perimeter Roadway into a new, wider road that is easier to
navigate. Also included in this project was the re-contouring of nearby
ditches.
| | Part 1542 Security System |  This project provided for
the installation of a state-of-the-art access control system that includes a
Closed- Circuit Television Network (CCTV), telephone system, computer aided
dispatch, Emergency Operations Center and security badge system. Also included
in this project was the construction of a communications center (AVCOM)
facility and data center.
| | Runway 6/24 Conversion Project |  This
project will convert existing Runway 6/24 into Taxiway D and includes
pavement rehabilitation, new lighting and pavement markings.
|
|
|
|
| |